RAIL TEST SYSTEMS

Gearbox Test System

MATLAB-based test system delivered to TMS Motor in 2023 for validating train gearbox performance, durability and behaviour under operating conditions, acquiring analog sensor data via a processor for real-time monitoring and analysis.

2023Türkiye
Gearbox Test System

Project Overview

MATLAB-based test system delivered to TMS Motor in 2023 for validating train gearbox performance, durability and behaviour under operating conditions, acquiring analog sensor data via a processor for real-time monitoring and analysis.

The gearbox is a critical train component that transfers power from the motor to the wheels. Before a train enters service, its gearbox is rigorously evaluated by this test system to confirm that it can withstand operating conditions and meet the expected performance levels. Planck Signaling completed and delivered the system to TMS Motor in 2023 for use in their gearbox test operations.

An algorithm designed in MATLAB acquires analog signals from the sensors, processes them through a processor and visualises the results. Data can be monitored in real time and exported in raw form across different output formats for further analysis.

Project Highlights

  • TEST PLATFORMTrain gearbox test bench
  • DATA ACQUISITIONReal-time analog acquisition via processor
  • ALGORITHMMATLAB-based processing & visualisation
  • DURABILITYOverload & impact response evaluation
  • PERFORMANCEEfficiency, power, vibration & noise metrics
  • CUSTOMERTMS Motor

Project Timeline

Q1 2023

Requirements & Design

Test requirements analysed with TMS Motor; sensor layout, processor architecture and MATLAB algorithm designed for gearbox testing.

Q2 2023

Development & Integration

MATLAB-based data acquisition and processing algorithm developed; sensors and processor integrated for real-time analog data handling.

Q2 – Q3 2023

Validation & Acceptance Tests

System validated through durability and performance tests; data recording, analysis and visualisation outputs verified against acceptance criteria.

Q4 2023

Delivery to TMS Motor

Test system delivered to TMS Motor for use in train gearbox testing operations; commissioning and handover completed.

Our Projects

Other Projects

All Projects

Let's talk about your next project

Our team of engineers and project managers is ready to bring your project to life with precision and efficiency.

Contact Us